Friday, November 20, 2026

Subscribe

EconomyEdition DR CongoDR Congo

DR Congo’s Kisenge plans manganese processing plant

In Kisenge, Lualaba, SCMK-Mn wants to process manganese locally into MnO₂ through a PPP estimated at $100m. The project targets the battery supply chain and seeks to revive a long-underused site.

Neighbourhood scene in Lubumbashi with residents, a kiosk and a blurred project document in hand

A long-awaited plant in an area that still exports too little processed ore

In Kisenge, Lualaba, manganese is not just a resource extracted from the Congolese subsoil. It is also an unfulfilled industrial promise. In a country where local processing is an increasingly pressing issue, the project led by the KISENGE Manganese Mining Company (SCMK-Mn) revives a simple idea: retain more value in the Democratic Republic of the Congo, rather than let raw materials flow to processing chains elsewhere.

This ambition fits a now familiar framework in Kinshasa and in the region’s mining capitals: African mineral-producing states are seeking to move up the value chain as batteries, energy storage and certain cathode materials attract fresh investment. Manganese has a particular role in this. Electrolytic manganese dioxide, or MnO₂, is used in several battery technologies, which explains the growing interest in processing plants closer to deposits.

In this case, SCMK-Mn is a state-owned company in the Congolese portfolio. The Ministry of the Portfolio lists it among state-owned mining companies, and the CTCPM database says it is associated with manganese and has “in production” status. The technical information available on the portal also gives its date of establishment as 1980, a reminder of the age of the Kisenge industrial site and the slow pace of successive attempts to revive it.

The project: processing locally with a private partner

The project document consulted by ANAPI describes an industrial plant in Kisenge, Lualaba, based on a public-private partnership. Its stated aim is to process manganese into electrolytic manganese dioxide. The document sets out several stages: updating geological knowledge, pre-feasibility and feasibility studies, mining the deposit, and then producing MnO₂. It also says the company is seeking a private partner to provide the investment and technical expertise.

The stated cost is $100 million. The proposed partnership would run for 20 to 30 years. On paper, the arrangement follows a familiar model in the Congolese mining industry: the state retains the asset, while the private sector provides capital, processes and takes on part of the risk. In practice, such a model only works if the technical studies are robust, responsibilities are clear and logistics are in place. The public document does not say whether all the preliminary studies have already been carried out. This lack of detail matters, because processing projects often fail not at the announcement stage but in the execution chain.

The choice of Kisenge is no coincidence. The site’s industrial history has been profoundly shaped by difficulties in transporting output. In 2015, Radio Okapi reported that 400,000 tonnes of manganese were stranded in Kisenge. In 2018, the same outlet reported a partial resumption of activity after rail traffic on the Dilolo-Angola line reopened, with shipments to Lobito. These episodes show that manganese’s value depends on more than geology. It also depends on railways, regional corridors and the ability to secure a reliable logistics chain to Atlantic ports.

Recent data reinforce the picture of a recovery that remains fragile but is real. For the first quarter of 2026, the CTCPM reports that the company exported 2,502.27 tonnes of manganese concentrate. These volumes remain modest compared with the stocks reported historically, but they point to a minimum level of activity after years of inertia. The project brief cited by ANAPI also explicitly places the DRC in the global value chain for battery materials and within a broader drive for more sustainable industrialisation.

What local processing could mean for the DRC and the region

The project goes beyond Kisenge. In the DRC, the debate on local processing is not limited to copper or cobalt, which are more prominent in exports. It now extends to other strategic minerals. This reflects a broader political shift: the country is seeking to move beyond the role of a mere supplier of concentrates. In the long term, such a change could generate more tax revenue, more skilled jobs and a denser industrial base around Lubumbashi, Kolwezi and the country’s south-western production areas.

But the impact will not be the same for everyone. For the Congolese state, the issue is how to develop a public asset that has long been underused. For the private partner, the appeal lies in access to raw materials and a stronger position in a market linked to batteries. For the people of Kisenge and nearby communities, the questions are more tangible: roads, power, jobs, subcontracting, the movement of goods and stable markets. If the plant operates, it could benefit the local economy. If it remains a project on paper, it will add just one more promise to a long list.

The region is not standing still. The DRC shares with several southern African countries the same pressure to capture more value from mining. Zimbabwe, Botswana, Zambia and Gabon are also making a series of announcements on local processing and moving up the value chain. Within the Southern African Development Community, the question has become strategic: how can countries capture more revenue from critical minerals while securing logistics corridors and electricity? The Kisenge project is therefore part of a very real regional competition in which raw ore is no longer enough to make the difference.

The signal across the continent is clear. Africa no longer wants to export only tonnes. It wants to export embedded labour, skills and more complex products. The Congolese effort around manganese illustrates this shift, with all its promises and constraints. What happens next will depend on very concrete factors: completing the studies, choosing a partner, ensuring rail links to Angola are reliable, and aligning industrial policy with project discipline. That is where the credibility of this revival will, or will not, be measured.

Automatic translation. Original French version

News quiz

Edition DR CongoDR Congo: the news quiz for 14–15 November

5 questions