Processing closer to orchards becomes a strategic priority
Tanzania has no shortage of cashew nuts. What it still lacks, above all, is the capacity to process them at home. In Dodoma, the challenge is no longer simply to produce more, but to capture more value before the raw material leaves the country. The issue is economic, social and industrial all at once. It affects producers’ incomes, rural employment and the country’s place in East African trade.
This direction is part of a broader national strategy. Tanzania wants to move its agriculture up the value chain by 2030, while strengthening local processing of exported products. In cashews, the policy is clear: production must continue to grow, but factories must keep pace. The government has also organised the sector through the Cashew Industry Act, which gives the Cashewnut Board of Tanzania responsibility for regulating production, grading, processing and marketing.
Algerian investment enters a sector already in transition
According to the Tanzanian Embassy in Algiers, Algerian group Anacard’Or Cashew plans to build three modern processing plants in the country. The first facility is planned for Masasi, in the Mtwara Region, through a joint venture with local partner Kilimanjaro Nuts Limited. The timeline refers to preparations for warehouses in Masasi, followed by the arrival of equipment from Vietnam from January 2027. The investment amount has not been disclosed.
The project is not starting from scratch. In Mtwara, the Maranje site has already been identified as a future cashew industrial park. The Cashewnut Board of Tanzania has secured 1,572 acres, or more than 630 hectares, there for processing plants, warehouses, a laboratory and storage facilities. The authorities are also offering tax and land incentives to attract Tanzanian and foreign investors.
Some infrastructure is already in place in the region, but the industrial ecosystem still needs to be strengthened. The regional office of Tanzania’s industrial development service says Mtwara has significant agricultural potential but a still-limited industrial base. Processing agricultural products therefore remains an evident priority, rather than an established practice.
Production is rising, but processing capacity has yet to catch up
The figures show the imbalance. In the 2025/2026 season, Tanzanian cashew production reached 617,683 tonnes, up 17% year on year, according to an estimate reported by the national press based on sector data. The government is targeting 750,000 tonnes in 2026/2027, then 1 million tonnes by 2030. At the same time, the official goal remains to process 60% of the harvest locally, compared with a lower level today.
The contrast is stark. The country has already increased its production over a decade, from 155,244 tonnes in 2015/2016 to more than 617,000 tonnes in 2025/2026, according to government data. But processing capacity remains behind. A Tanzanian Investment Centre report estimates installed capacity at large factories at about 140,000 tonnes a year, well below the volume available. In other words, the raw material is there, but the value chain is not yet absorbing it at the same pace.
This gap explains the interest in private investors. The public sector sets the framework, but it cannot finance all the factories, shelling lines, warehouses and technical training on its own. The Cashewnut Board of Tanzania has therefore spent several years pushing to attract capital and improve the business environment. Local processing is no longer a slogan. It is an industrial test.
What moving up the value chain means for producers and the economy
For growers in southern Tanzania, the stakes are concrete. Selling raw nuts brings in less than supplying nuts that have already been shelled and processed. But local processing can also absorb more labour, particularly women and young people in the agricultural areas of Mtwara, Lindi and neighbouring regions. It could also reduce dependence on foreign buyers, who currently capture most of the margin.
The sector also matters for public finances. Cashew exports remain an important source of foreign exchange for Tanzania, as the official trade portal notes. Every tonne processed locally retains more value in the country through jobs, tax revenues, logistics services and by-products. The government also points to a wider range of derivative products, from juice to oil, to show that the sector can support a denser agro-industrial base.
But scaling up requires more than announcements. Industrialists still cite familiar obstacles: financing, equipment, permits, energy, a reliable supply and the quality of raw produce. In April 2026, processors called for a better business climate, even as the country says it wants to reach 60% local processing by 2030. The question, then, is not only whether factories will open, but whether they can operate sustainably.
Tanzania’s cashew sector is being watched well beyond Dodoma
The Tanzanian case matters at regional level. Within the East African Community, it illustrates a question shared by several African economies: how to move away from the raw-export model without holding back agricultural production. The answer often involves the same levers: industrial parks, targeted incentives, suitable financing and better-structured procurement policies. Tanzania is moving in this direction, with cashews as a pilot sector.
The continental significance is equally clear. If the planned capacity at Maranje and the other plants is realised, Tanzania will be able to consolidate its position among Africa’s leading producers while showing that moving up the value chain is possible in a crop long dominated by raw exports. The next milestone to watch will therefore be less the announcement of new projects than their actual commissioning, as the country looks towards the 2026/2027 season and then the 2030 deadline.



