Saturday, November 21, 2026

Subscribe

NewsEdition DR CongoDR Congo

Kamina’s new water plant highlights DR Congo’s challenge of reliable public services

A new plant in Kamina is set to supply 230,000 people with drinking water. The project reignites debate about the reliability of public services and DR Congo’s ability to meet its coverage targets.

Anonymous hand, ballot box, voter card and indelible ink at a civic office in Kinshasa.

In Kamina, water is no longer just a promise

In many Congolese cities, turning on a tap remains a gamble. In Kamina, in Haut-Lomami, that long wait has entered a new phase with the commissioning of a new drinking-water abstraction and treatment plant. The challenge is straightforward but decisive: to turn an available resource into a regular, safe and sustainable public service.

The inauguration comes in a country where freshwater is plentiful but distribution remains fragile. The Democratic Republic of the Congo has considerable water resources, yet disparities between urban centres, secondary cities and rural areas remain wide. Access to drinking water is also a measure of the quality of the state, as it directly affects health, households’ daily routines and the costs borne by families.

A plant for a city that has waited a long time

The Lovoy plant was inaugurated on Wednesday 29 July 2026 in Kamina, the capital of Haut-Lomami. According to information released at the time, it is expected to supply about 230,000 people and can produce up to 7,000 m³ of drinking water per day. Raw water is drawn from the Lovoy River, known for its high iron content, and treated before distribution.

The presidential visit also served as a political signal. The start of pumping shows that the facility has entered its operational phase, although actual access will depend on the connecting network and maintenance capacity. A social connections programme is due to be launched to connect households to the new infrastructure.

Kamina was not chosen by chance. The city in south-eastern DR Congo has long suffered from a supply shortfall that the authorities describe as longstanding, to the point of calling it a delay of more than 50 years. In DR Congo, projects of this kind often address two urgent needs: making up for decades of underinvestment and stabilising a public service that still relies too heavily on ad hoc expansions.

Water governance, a national project taking shape

The inauguration is part of a broader framework. In December 2025, the Congolese government adopted the National Public Water Service Policy (PNSPE), conceived as a framework for governing the sector. It sets a clear target: 90% coverage in urban areas and 70% in rural areas by 2035.

The approach matters. The PNSPE is not limited to building infrastructure. It also aims to clarify responsibilities, secure public and private investment, and provide a framework for managing a sector that is often fragmented. In a country as vast as DR Congo, the challenge is not simply to produce water. It must also be transported, billed affordably, kept free of leaks and kept to quality standards all the way to the final distribution point.

The task is all the more pressing because needs are growing rapidly. Congolese cities are expanding, urban demand is rising and infrastructure is ageing. In Kinshasa, the authorities have already highlighted several treatment plants and production units intended to extend coverage, showing that the national strategy relies on multiple hubs rather than a single large plant. Kamina is therefore part of an effort to build a network across the country.

Funding and the question of results

The new public policy comes with significant external support. The Water and Sanitation Access Programme (PASEA) was approved in its first phase with $400 million in funding. This initial phase covers the provinces of Kasaï, Kasaï-Central, Kasaï-Oriental and Kwilu, with the aim of providing 2.9 million people with drinking water and 2 million with basic sanitation by 2029.

For the government, these programmes have an immediate economic impact. Drinking water reduces health costs linked to waterborne diseases, cuts the hours spent searching for water and boosts the productivity of small businesses, markets and the informal economy, which is highly visible in Congolese cities. For households, particularly women and children who still often bear the burden of collecting water, the impact is tangible: fewer journeys, less uncertainty and more time available.

But the challenge remains continuity. A new plant cannot, on its own, solve problems with weak secondary networks, connections management or technical losses. In DR Congo, many water projects get off to a successful start before running into difficulties with maintenance, operating costs or coordination between public and private stakeholders. Monitoring will therefore be just as important as the inauguration itself.

A local decision with continental significance

Across Africa, the Kamina project is a reminder of a truth too often underestimated: water security is now a matter of stability, public health and land-use planning. DR Congo recently made the case at continental level for an African coalition for water security at the African Water Forum in N’Djamena. The message is clear: countries across the continent want more solutions designed around their actual needs, rather than simply based on imported technical frameworks.

The signal is just as clear for Central Africa. Major cities are not the only places at stake. Intermediate cities such as Kamina are increasingly central to issues of mobility, health and growth. If basic services keep pace, they can retain residents, support regional trade and strengthen local economies. If they fall behind, pressure shifts to provincial capitals and major cities.

The significance of the inauguration therefore extends beyond Kamina. It says something about DR Congo in 2026: a country seeking to turn its potential into tangible services by drawing on national reforms, multilateral funding and visible investment on the ground. The real measure of success will emerge in the coming months, through the regularity of distribution, the number of households actually connected and the infrastructure’s ability to remain operational over time.

Automatic translation. Original French version

News quiz

Edition DR CongoDR Congo: the news quiz for 14–15 November

5 questions