Wednesday, November 18, 2026

Subscribe

EconomyEdition Côte d'IvoireCôte d'Ivoire

Côte d’Ivoire targets financiers and networks behind illegal gold mining

Côte d’Ivoire is strengthening its military, judicial and environmental response to illegal gold mining. Abidjan now wants to target financiers, machinery suppliers and local accomplices.

A lorry carrying mining equipment on a road near Yamoussoukro, with Ivorian workers at a transport depot.

In Côte d’Ivoire, the fight against illegal gold mining is moving up a gear. After several years of operations often followed by renewed occupation of the sites, the state now wants to target the networks that supply machinery, finance operations and organise the movement of gold.

This shift comes as clandestine activity affects much of the country, degrades farmland and threatens waterways. It also coincides with a period of rapid expansion in Côte d’Ivoire’s industrial gold sector, which the government wants to regulate more effectively and develop.

A national response coordinated from Yamoussoukro

On 4 and 5 September 2026, a national workshop held in Yamoussoukro brought together government departments, security forces and representatives of the mining sector. Regional prefects were placed at the centre of the system. They have six months to step up operations and prevent operators from returning to evacuated sites.

The National Security Council, which met on 17 September, adopted the workshop’s main recommendations. The plan notably provides for more brigades for the Special Group for the Fight against Illegal Gold Mining, the strengthening of local units and the creation of 21 river security platoons. These units are to monitor Côte d’Ivoire’s four main rivers and their tributaries, where mechanised dredgers are installed directly in riverbeds.

The plan also includes environmental and social measures. The authorities have announced the restoration of degraded land, with support from military engineering units and labour-intensive public works programmes. They also plan to support Ivorian artisanal miners as they move into legal activities. This will be crucial in rural areas where gold mining provides quick income, despite its lasting effects on soil and water.

The government has also suspended the issuance of new semi-industrial and artisanal mining permits for six months. The measure is intended to allow a review of monitoring mechanisms, as the boundary between authorised activity and clandestine practices can remain difficult to police on the ground.

More resources to operate on land and water

On 30 September 2026, at the Agban gendarmerie barracks in Abidjan, Vice-Premier Minister and Defence Minister Téné Birahima Ouattara handed over the first batch of equipment to units engaged in the fight against illegal gold mining.

The batch includes 30 pick-up trucks, 35 troop transport vehicles, 300 motorbikes, 12 inflatable boats and several drones. The overall order comprises 48 pick-up trucks, 40 troop transport vehicles, 360 motorbikes, 84 inflatable boats and 35 drones. The equipment is to be distributed among the Special Group for the Fight against Illegal Gold Mining, the Special Surveillance and Intervention Brigade, and local gendarmerie and Water and Forestry units.

The choice of equipment reflects how the phenomenon is changing. Operations no longer target only workers equipped with rudimentary tools. The forces are finding excavators, motor pumps, crushers and dredgers capable of moving large volumes of earth and sediment. Aerial and river surveillance is therefore becoming as important as ground patrols.

In the Indénié-Djuablin region, an operation conducted from 16 to 27 August led to the destruction of 109 dredgers, 134 motor pumps, 204 crushers and 200 washing devices. Only three people were arrested. The gap between the scale of the equipment destroyed and the number of arrests illustrates the central challenge: owners and financiers often remain far removed from the operations.

Customs officials also seized two lorries in Abidjan on 14 July, carrying 186 dredgers in parts without supporting documents. The case shows that the fight is not confined to forests and villages. It also involves roads, warehouses, ports, import channels and financial intermediaries.

The law aims to reach those behind the operations

On 23 September, the Council of Ministers adopted a draft law amending the Penal Code. The text creates specific offences targeting instigators, receivers of stolen goods, financiers and complicit site owners. Where a public official is involved, sentences can reach 20 years in prison, according to the Ivorian government statement.

Parliament still has to examine the bill. If adopted, it will give magistrates a more precise legal basis for prosecuting those who supply machinery or protect mining operations. Until now, enforcement has often focused primarily on people present at the sites, even though the equipment points to the existence of organised chains.

Several proceedings have implicated Chinese nationals, but court cases also show the role of Ivorian intermediaries and people of other nationalities. In the case involving Fronan and Dabakala, in Hambol, 71 defendants were tried in 2025. Reports published after the verdict said convictions included a Chinese businessman, an Ivorian officer, an Ivorian-Beninese businessman and a former MP. Decisions reported by the Ivorian press can be found in the account of the trial before the Economic and Financial Criminal Division.

This makes it impossible to reduce the problem to a single nationality. The networks rely on financing, imported equipment, misused permits, local complicity and commercial outlets. Responsibility must therefore be established case by case, on the basis of evidence presented in court.

An environmental and economic emergency

The impact goes beyond public order. Mercury, cyanide and waste from ore processing contaminate waterways. Farmland is excavated and then abandoned. In some areas, clandestine mining can also disrupt access to drinking water.

The Côte d’Ivoire Water Distribution Company warned in August of the risk that some treatment facilities could be shut down if toxic substances reached rivers used for water supplies. The river platoons announced by the National Security Council will therefore have an environmental security mission as well as a role in protecting essential services.

The pressure is all the greater because official gold production is rising. Côte d’Ivoire produced 59.33 tonnes in 2025 and is targeting about 62 tonnes in 2026, with new mines coming into production. A national refinery is planned for the first half of 2027. Abidjan aims to become Africa’s leading producer by 2035.

An issue that extends beyond Côte d’Ivoire’s borders

Côte d’Ivoire is not alone in facing this challenge. Neighbouring Ghana has been fighting galamsey, the term used for clandestine mining, for more than a decade. The issue also involves borders, shared rivers and regional supply chains for machinery and minerals.

The workshop in Yamoussoukro also recommended closer cooperation with neighbouring countries. This aligns with the concerns of ECOWAS, the Economic Community of West African States, where the movement of people and goods makes faster information-sharing between government departments necessary.

The next test will come during the six months announced by the Ivorian authorities. It will be necessary to measure not only the number of sites destroyed, but above all their rate of reoccupation, the assets seized, the suppliers identified and the prosecutions brought against those protecting the networks. The diplomatic support Beijing has expressed for Abidjan’s tough stance will also have to translate — or not — into judicial cooperation and closer monitoring of equipment supply chains.

Automatic translation. Original French version

The quiz

The African economy in six questions

6 questions