Wednesday, November 18, 2026

Subscribe

EconomyEdition MoroccoMorocco

Kenitra: Morocco seeks to make auto industry a hub for EV batteries

The African Development Bank is financing a Gotion LFP battery gigafactory in the Rabat-Salé-Kenitra free zone. The project is set to strengthen Morocco’s automotive ecosystem and exports to Europe.

In Kenitra, commuters wait near a bus stop on the edge of an industrial zone in bright daylight.

Morocco advances on a decisive link in the electric car

In Kenitra, it is no longer just a matter of assembling vehicles or wiring harnesses. Morocco is now seeking to move up a notch in the value chain, into the most strategic part of the electric vehicle industry: batteries. This shift matters because it could change the types of jobs created, the country’s place in exports and its ability to capture more added value.

The project is part of a trajectory under way for several years. The Kingdom, whose capital is Rabat, has built an automotive ecosystem around free zones, ports, logistics and subcontractors. In 2025, several consistent sources reported that Moroccan car production had passed the one-million-vehicle mark, a symbolic milestone confirming the country’s growing importance in the global industry.

What the AfDB is financing in Kenitra

On 24 July 2026, the African Development Bank approved a €100 million loan for Gotion Power Morocco to support an integrated lithium iron phosphate battery gigafactory in the Rabat-Salé-Kenitra free zone. The institution also said it intended to mobilise up to a further €141 million from other partners. The Associated Press carried the news, describing it as support for Africa’s first electric vehicle battery plant.

The project has not come out of nowhere. AfDB environmental documents show that a phase I is planned in Kenitra, in the Atlantic Free Trade Zone, with an announced annual capacity of 20 GWh of LFP batteries and 100,000 tonnes of cathode materials. The same file states that construction began in July 2025 and that phase I was then expected to come on stream in the second quarter of 2026.

The difference between the figures should be read with caution. The AfDB announcement refers to an initial stage of 10 GWh of cells and packs, while the technical documents cite 20 GWh for phase I. The two figures may therefore refer to different scopes: either a phased rollout or an update to the project. As things stand, the public documents do not allow a definitive conclusion.

The announced industrial set-up goes beyond simple assembly. It includes the production of cathode materials, cell manufacturing and pack assembly. This integration, from raw material to finished product, is what makes it an integrated gigafactory. The chosen technology is LFP, a chemistry that uses lithium, iron and phosphate, with no nickel or cobalt.

Why this plant matters to Morocco’s economy

The first challenge is industrial. According to the AfDB, the first phase is expected to generate more than 600 direct jobs and target a 70% local integration rate. Announcements made when the project was first presented went further, with up to 17,000 direct, indirect and induced jobs, including 2,300 skilled positions. These figures are not necessarily contradictory: they describe different levels of impact. The first measures the initial phase, while the second refers to the project’s broader effect over time.

The second challenge is energy and trade. The AfDB says the complex will be powered mainly by renewable energy. For Morocco, this is no minor point. The country’s automotive industry has been built on a promise of logistical competitiveness, as well as an image of cleaner production than in other hubs. This credibility matters particularly to European customers, who remain the sector’s main export market.

The Kenitra site also fits into an already dense industrial geography. Morocco is home to Renault and Stellantis plants, and its transport networks have been strengthened by ports, motorways and free zones. In July 2025, Reuters reported that Stellantis would more than double its capacity in Kenitra to reach 535,000 vehicles a year, a sign that the north of the Kingdom remains at the heart of the automotive industry.

For Moroccan policymakers, the rationale is clear: attract not only assembly lines, but also critical materials, cells and, eventually, recycling. This shift reduces dependence on imports of high-value components and could make a supply chain more resilient, though it remains exposed to global price fluctuations and trade tensions.

Gotion’s role and Volkswagen’s helpful shadow

Gotion High-Tech is a Shenzhen-listed Chinese manufacturer active in cells, packs and energy storage systems. It gained visibility in Europe when Volkswagen announced in 2020 that it would acquire a 26% stake for about €1.1 billion. The deal, confirmed in the German group’s 2021 annual report, made Volkswagen its largest shareholder.

This link sheds light on the Moroccan project, but it should not be confused with a direct investment by the German carmaker. Public information does not show that Volkswagen is financing the Kenitra plant or has secured its output. The partnership between the two groups has, however, bolstered Gotion’s industrial credibility in Europe, where demand for batteries is growing as car ranges are electrified.

Morocco is not starting from scratch. In Jorf Lasfar, COBCO, a joint venture between Moroccan fund Al Mada and China’s CNGR Advanced Materials, inaugurated its first electric battery materials unit in June 2025. Official Moroccan documents describe a site focused on cathode precursors, recycling and a gradual shift to green energy.

This move upmarket matters to the ecosystem. A cell plant needs an industrial cluster able to supply inputs, technical services, skills and recycling solutions. In other words, the contest is not just about one flagship plant. It is about Morocco’s ability to build a complete supply chain, from critical materials to end-of-life batteries.

Significance beyond the Moroccan market

The Kenitra project therefore goes beyond the national picture. It places Morocco in the competition taking shape around batteries between Europe, Asia and industrial hubs close to end markets. For Rabat, the benefit is twofold: to consolidate its position in the automotive industry and to offer Africa an example of industrial upgrading backed by African, Chinese and multilateral capital.

The continental significance is real, but should not be overstated. The continent still has few integrated battery plants, and most projects are at different stages. What is at stake in Morocco is demonstrating that an African country can attract a central part of the global electric vehicle supply chain, provided it aligns land, energy, training, logistics and regulatory stability.

One key question remains: timing. AfDB documents indicate that work was already under way before the loan was approved, but do not set a firm date for a stable start to commercial operations. In the coming months, attention will therefore focus on the plant’s actual ramp-up, its alignment with Morocco’s other battery materials projects and its ability to meet its local integration commitments.

Automatic translation. Original French version

The quiz

Edition MoroccoMorocco in 5 questions

5 questions