Fast rail to link north and south, without promising the impossible
In Ivory Coast, the question is no longer just how to build more roads. It is also how to move people, goods and services more quickly between the country’s main centres, from Abidjan to Yamoussoukro, then on to Bouaké, Korhogo and Ferkessédougou. In a country where population growth and urbanisation are putting pressure on existing routes, rail is once again a matter of spatial planning, not just transport.
The project included in the 2026-2030 National Development Plan takes the form of a 640-kilometre high-speed line, designed to link the industrial south with the agricultural and commercial north. The idea is simple on paper: cut journey times, ease trade and better organise the country around more reliable corridors. In practice, however, such infrastructure also signals something else: Ivory Coast now wants to make rail a tool for competitiveness, connecting remote areas and rebalancing its regions.
What Abidjan is planning, and what it reveals about the 2026-2030 NDP
The Ivorian government has presented the 2026-2030 NDP as the country’s new economic roadmap, with total investment of 114,838.5 billion CFA francs announced, average growth targeted at 7.2% and more than 3 million formal jobs expected over the period. Rail features among the strategic infrastructure projects intended to support industrialisation and the integration of the country’s regions. The plan also builds on the results of the 2021-2025 cycle, which reported average annual growth of 6.5% and an execution rate of 94.01% for the previous plan.
In this context, the Abidjan-Ferkessédougou high-speed train is not presented as a standalone project. It forms part of a broader framework in which the state is seeking to connect production basins to ports, regional markets and future industrial zones. The public-private partnerships portal lists it among the 2026 NDP projects, under the authority of the Ministry of Infrastructure and Road Maintenance, confirming that it remains in the institutional preparation phase.
The planned line is to pass through Yamoussoukro, Bouaké and Korhogo before reaching Ferkessédougou. The government, through the Ministry of Planning, has also floated the idea of cutting the Abidjan-Yamoussoukro journey to about 45 minutes, while the Abidjan-Bouaké journey would fall from nearly four hours to less than two, according to the project fact sheet. These figures convey the scale of the ambition. They do not yet establish whether it is feasible.
An ambitious project, but still a long way from construction
The key point is this: by the public documents’ own account, this high-speed train is the least advanced rail project in the infrastructure package announced. Its funding remains to be secured through a public-private partnership. Detailed preliminary design studies, financial structuring and contract awards are still to come. In other words, Ivory Coast has set out a vision, but has yet to lock in the industrial and budgetary course that would make it possible to lay the first rail.
This caution is all the more necessary because the country has already experienced the limits of major rail plans. The rehabilitation of the Abidjan-Ouagadougou-Kaya line, operated by SITARAIL under a concession, continues to face structural difficulties. A World Bank document published recently still mentions a derailment near Azaguié in April 2025, a sign of a network that first needs maintenance, safety measures and operational continuity.
The contrast is instructive. On the one hand, a very high-speed project that projects the country towards 2035. On the other, an existing line whose upgrade remains a daily challenge. This means the issue is not simply to build faster or bigger. Ivory Coast’s railways must also prove that they can be maintained, secured and made profitable over the long term. Without that, high-speed rail risks remaining a symbol rather than becoming a system.
Why this project matters to Ivory Coast’s economy and West Africa
Northern Ivory Coast accounts for a significant share of agricultural, commercial and logistics flows. Bouaké remains a major inland hub; Korhogo and Ferkessédougou serve as gateways for trade with Burkina Faso and, more broadly, the Sahel. A fast rail link could therefore ease pressure on roads, reduce some transport costs and strengthen connections between the economic capital, the political capital and inland cities.
For businesses, the benefits are clear: moving goods more efficiently, bringing value chains closer together and consolidating Abidjan’s position as a regional logistics hub. For the population, the expected gains are chiefly in mobility, access to markets and shorter journey times. For the towns along the route, the project could also spur urbanisation, property development, services and activity around stations, provided local connections keep pace.
At the sub-regional level, the rationale reflects that of ECOWAS, which has for several years been pushing for better market integration through transport infrastructure. The Abidjan-Ouagadougou railway, followed by the planned high-speed line to Ferkessédougou, extends this idea: connecting landlocked economies to Atlantic ports and reducing transshipment costs. In a West Africa where road corridors are congested and sometimes vulnerable, rail remains a strategic lever, provided it is funded, governed and maintained as such.
The next phase will therefore depend less on the principle than on the method. The decisive steps ahead will be finalising the technical studies, structuring private financing, and then the state’s ability to align the project with its other corridors, particularly those linked to the port of San Pedro and routes to neighbouring countries. If Ivory Coast can maintain this coherence, the high-speed train could become a lasting marker of its entry into a new phase of national development. Otherwise, it will join the long list of major projects announced before they are actually launched.



