Saturday, November 21, 2026

Subscribe

NewsEdition GabonGabon

In Gabon, Airtel boosts 4G as 5G remains unavailable to subscribers

Airtel Gabon and ZTE are deploying technology intended to increase 4G network capacity. The upgrade prepares the way for 5G, but its commercial launch still depends on regulatory decisions and investment.

Passengers board a bus in Libreville, with a telecommunications antenna visible above the city.

In Libreville and Gabon’s other provinces, faster mobile connections also depend on the capacity of existing antenna sites. Airtel Gabon and equipment maker ZTE have announced a 4G upgrade intended to increase that capacity. But this development does not mean that 5G is already available to the public.

A 4G upgrade ahead of the move to 5G

On 13 October 2026, Airtel and ZTE announced the commercial deployment in Gabon of a solution combining FDD, TDD and Massive MIMO. FDD and TDD refer to two ways of organising frequencies for sending and receiving data. Massive MIMO uses multiple antennas to transmit more data streams simultaneously.

According to ZTE, initial results on the network in question show a 107% increase in total throughput per site, a 20% rise in capacity and a 41% gain in radio resource efficiency. The company also reports higher improvements on the 2.6 GHz band. These figures were provided by the equipment maker: no independent performance measurements have been published in the sources consulted.

The distinction matters for subscribers. Greater capacity can help a network handle more traffic or reduce congestion, particularly at peak times. It does not, by itself, guarantee the same speed for every user. The quality people experience also depends on their phone, local coverage, the number of people connected and the link between antenna sites and the core network.

Gabon’s challenge: expanding coverage without widening the gap between regions

The announcement comes as Gabonese authorities prepare to introduce 5G. On 17 December 2025, the Electronic Communications and Postal Regulatory Authority (ARCEP) brought together Airtel Gabon and Moov Africa Gabon Télécom to discuss the timetable and conditions for deployment. The talks focused in particular on investment, frequencies and transport infrastructure.

Operators have flagged a need for fibre-optic infrastructure, particularly in certain provinces such as Nyanga and Ogooué-Ivindo. Fibre connects antenna sites to the rest of the network and helps carry data quickly. Without sufficient links, adding radio equipment will not solve every coverage or speed problem.

ARCEP also highlighted two practical constraints for users: the price of compatible devices and purchasing power. A launch in densely populated areas or business districts of Libreville would therefore not necessarily benefit residents in less well-served areas at the same time. For forestry and mining companies, 5G could support certain professional uses. For individuals, its value will depend above all on service availability, price and access to suitable devices.

Technology that prepares the ground, but does not replace public decisions

Massive MIMO can improve a site’s capacity by making better use of available frequencies. The GSMA, an international mobile industry association, describes this family of technologies as a way to advance 4G and 5G networks. However, upgrading antennas is not enough to switch on a 5G network: a regulatory framework, allocated frequencies, investment and a coverage roadmap are also needed.

In December 2025, ARCEP said discussions would continue to clarify frequency bands, priority areas and deadlines. The announcement by Airtel and ZTE is therefore a technical step, separate from an official decision on the commercial launch of 5G. At this stage, it would be premature to infer a date for a nationwide launch.

For customers, the immediate priority remains measurable improvements to 4G service, including outside the most profitable areas. For operators, the task is to increase capacity without waiting for every element of a 5G network to be in place. For the regulator, the challenge is to govern access to frequencies and ensure that investment translates into effective service quality.

A regional infrastructure and access challenge

The issue extends beyond the two companies. Gabon is part of the Economic and Monetary Community of Central Africa (CEMAC), where digital exchanges and cross-border services also rely on dependable networks. Better infrastructure can support administrations and businesses, but it will narrow disparities only if coverage expands beyond urban centres and services remain affordable.

The next step to watch is therefore not so much a promise of speed as a series of verifiable decisions: publication of a roadmap, frequency choices, covered areas and service-quality results. These are the measures by which the tangible impact of the announced upgrade on Gabonese people will be judged.

Automatic translation. Original French version

The quiz

Edition GabonGabon in 5 questions

5 questions