Saturday, November 21, 2026

Subscribe

EconomyEdition TunisiaTunisia

Tunisia: AfDB revives Sfax metro amid urban congestion and funding review

In Sfax, the AfDB is launching new studies for the metro’s first phase. The project must settle the route, viability and financing in a Tunisian city facing mounting mobility pressures.

Anonymous voters wait in a brightly lit polling station in Sfax, with a ballot box and ballot papers.

In Sfax, mobility is no longer a matter of convenience. It has become a question of urban organisation.

In the economic capital of southern Tunisia, traffic jams tell more than a story of delayed infrastructure. They also show how quickly the city has grown, without transport keeping pace. For the people of Sfax, the challenge is straightforward: to get to work, study, produce and travel without losing time on a road network nearing saturation.

It is against this backdrop that the African Development Bank has revived the Sfax metro project, not with construction starting immediately, but with a crucial preliminary step: technical and financial studies for the first phase of the T1 line. The call for expressions of interest published on 22 July 2026 seeks firms capable of updating transport demand forecasts, assessing economic viability and reviewing the project’s fiscal sustainability. In other words, work is first advancing on the ground of figures, routes and financing.

A city that carries considerable weight in Tunisia

Sfax is no secondary urban centre. According to the municipality, it has about one million inhabitants, or nearly 9% of the national population. The 2024 general census by the National Institute of Statistics confirms a population of 1,047,468 in Sfax Governorate. This demographic scale puts the city at the heart of the debate on urban transport in Tunisia.

The problem is not new. The municipality’s urban planning documents identify congestion, the deteriorating road network and declining public transport as structural constraints. The city has many roads but remains caught in intensive car use and mixed traffic, often with poorly defined priorities. Urban public transport still accounts for nearly 21% of motorised journeys, but it can no longer meet the needs of a growing urban area.

This reality extends beyond Sfax’s geography. Across Tunisia, major cities face the same dilemma: how to modernise mobility without increasing the public-sector bill, when budgets are constrained and investment needs are numerous. The answer increasingly lies in public transport on dedicated infrastructure: modes that run on their own routes, away from ordinary traffic congestion.

What the Sfax metro project entails

The project, announced in 2015, is based on a phased plan. In its complete form, it envisages two tram lines and three bus rapid transit lines, covering a total of about 70 kilometres. The first phase covers the 13.5-kilometre T1 line to Chihia, as well as the launch of five trunk bus routes. These routes are intended to lay the groundwork for the target network by 2030.

Later phases would create a wider network. T2 is to link the city centre with the Gremda road, at least as far as the northern edge of the Km 4 ring road. T1 is then to be extended northwards as the El Ons neighbourhood develops. Finally, extending T2 and building the other BRT lines — bus rapid transit, with dedicated lanes and better-organised stops — will depend on actual urban development. The project is therefore designed to support growth, not merely to address current congestion.

The AfDB is also asking consultants to update the fiscal sustainability study in order to select the most suitable form of public-private partnership and financing structure. This point is central. In Tunisia, transport projects are often judged as much on their usefulness as on their ability to remain affordable over time. The question is not only whether to build a line. It is also who will finance it, who will operate it and at what cost to the public.

Why the project matters to residents and the local economy

For households, more reliable public transport could reduce the daily cost of travel and make journey times more predictable. For businesses, it could improve access to employment areas, ports, universities and public services. Sfax accounts for a significant share of Tunisia’s industrial, commercial and port activity. In a city where journey times weigh on productivity, mobility has become an economic factor in its own right.

The benefits will not be the same for everyone. Dense neighbourhoods and the busiest routes would gain better services, while outlying areas will remain dependent on the quality of connections. The city centre, university hubs and employment areas could benefit from the project sooner than urban fringes that are still poorly connected. That is why the studies requested by the AfDB are not a technocratic detail. They are intended to align the route with actual travel patterns, avoid design mistakes and assess the project’s impact across the urban area.

The regional context also adds to the project’s significance. In North Africa, urban transport has become an issue of urban modernisation as well as territorial equity. Tunisia, which is seeking to rebalance investment between the coast and the interior, is dealing here with an emblematic case: a dynamic regional metropolis still held back by infrastructure designed for a city of a different size. The project is part of a broader approach promoted by the African Development Bank, which is also funding road and industrial initiatives in Sfax, particularly in infrastructure and the Skhira zone.

A test for urban governance in Tunisia

The Sfax project says something important about Tunisia’s trajectory. Major cities are no longer waiting only for roads to be repaired. They are seeking mobility systems that can keep pace with urban densification, ease everyday pressures and bring coherence to travel. In this context, the Sfax metro is no decorative symbol. It is a test of governance, financing and the ability to deliver.

What happens next will depend on the studies now under way, and then on the ability of the Tunisian authorities and the AfDB to turn this preparatory work into concrete decisions. For now, the announced timetable remains one of a network built in stages, with the T1 first phase and five trunk bus routes as priorities. But in a city that has passed the one-million-inhabitant mark, the central issue is already clear: without credible public transport, urban growth eventually turns against itself.

Automatic translation. Original French version

The quiz

The African economy in six questions

6 questions