Saturday, November 21, 2026

Subscribe

EconomyEdition NigeriaNigeria

Solar power to connect 500 off-grid villages in Nigeria

In Abuja, the government and its partners are relying on solar-powered telecoms sites to connect 500 rural communities. The project aims to narrow the digital divide and expand internet access in areas with limited electricity.

Formal meeting in Abuja with four to six Nigerian officials in suits in front of a neutral backdrop.

Nigeria’s digital coverage still faces a simple obstacle: electricity

Nigeria’s telecoms market is vast, but access remains uneven. Data from the Nigerian Communications Commission show 195,108,814 mobile subscriptions in July 2026, while internet subscriptions reached 157,405,351 in May 2026. Yet in many rural communities, connectivity still depends on an electricity grid too unreliable to keep antennas, routers and transmission equipment running consistently.

This is precisely where the Distributed Access through Renewable Energy Scale-Up programme, or DARES, comes in. The initiative is funded by the World Bank and led by the Rural Electrification Agency, the public body tasked with accelerating access to electricity in rural and underserved areas. The project is expected to reach 17.5 million Nigerians and relies on decentralised solar solutions, mini-grids and private financing mobilised around a $750 million credit facility.

Mobile towers, solar panels and a challenge that goes beyond connectivity

As part of the programme, Hotspot Network Limited was selected to deploy telecommunications and broadband infrastructure in 500 underserved communities across the country. The project will provide 2G and 4G voice and data services, community Wi-Fi and digital equipment powered by renewable energy. The news was reported in the Nigerian press on 15 September 2026, while the framework for the DARES programme is confirmed by official REA and World Bank documents and statements.

The approach addresses a well-known structural constraint in Nigeria: the gap in electricity access between urban and rural areas. The World Bank recently estimated that in 2023, electricity access stood at 84% in urban areas, compared with 26% in rural areas. Under these conditions, powering telecoms sites with solar energy is not a technical convenience. It is essential to keeping infrastructure operational where the national grid is weak or absent.

The Nigerian government is tackling the problem on several fronts. In 2026, the Ministry of Communications, Innovation and Digital Economy confirmed the launch of Project BRIDGE, a programme to deploy 90,000 km of fibre-optic cable, covering all 36 states, the Federal Capital Territory and more than 770 local government areas. The ministry has also cited 3,700 new telecoms towers, priority sites in rural areas and the complementary use of satellites.

The strategy says much about the model Abuja is pursuing. The country no longer wants to treat connectivity and energy as competing priorities. It wants to bring them together. In villages, this could transform the lives of pupils taking online classes, health centres transmitting data, traders using digital payments and small businesses relying on a stable connection to sell beyond the local market. In major cities, by contrast, the debate is more about service quality, operators’ capacity and the true cost of access.

What the project says about Nigeria, ECOWAS and the continent

The Nigerian case extends beyond national borders. Across the ECOWAS region, where countries face vast gaps in electrification and digital coverage, Nigeria often serves as a large-scale test case. If Abuja succeeds in combining decentralised electrification with digital infrastructure, the model could inspire other countries in the region, especially those where extending the grid is too costly for conventional network expansion alone.

The DARES programme also forms part of a broader continental agenda. The World Bank now links the initiative to its Mission 300 agenda, which aims to accelerate access to electricity in Africa. Nigeria faces a dual challenge: narrowing the energy access gap and strengthening a digital economy that is already Africa’s largest by telecoms market size. For the continent, the message is clear: the digital transition will not advance at full speed without reliable energy infrastructure, especially beyond capital cities and major transport routes.

The question of implementation remains. Public announcements on towers, fibre and satellites set a direction, but the real test lies on the ground, in remote communities. The challenge is not just to install equipment. It must be maintained, funded, secured and integrated into practical local uses. That is where the true impact of a programme presented in Abuja as an inclusion initiative, rather than a simple infrastructure project, will be measured.

Automatic translation. Original French version

The quiz

The African economy in six questions

6 questions